The selection of a sub-contractor in a Highway construction project using the analytic hierarchy process (AHP)

au.identifier.bibno 0016-4626
au.identifier.callno Project Report CE6998 C454s 2003
dc.contributor.advisor Aran Namphol
dc.contributor.author Chanchai Treekrichwatana
dc.date.accessioned 2015-06-26T10:15:44Z
dc.date.available 2015-06-26T10:15:44Z
dc.date.issued 2003
dc.format.mimetype application/pdf
dc.identifier.uri https://repository.au.edu/handle/6623004553/5780
dc.language.iso eng
dc.publisher Assumption University
dc.rights This work is protected by copyright. Reproduction or distribution of the work in any format is prohibited without written permission of the copyright owner.
dc.title The selection of a sub-contractor in a Highway construction project using the analytic hierarchy process (AHP) en_US
dc.type Text
mods.genre Project Report
mods.location.physicalLocation AU Archives, 4th Floor (Cathedral of Learning)
thesis.degree.department Graduate School of Business
thesis.degree.discipline Computer and Engineering Management
thesis.degree.grantor Assumption University
thesis.degree.level Masters
thesis.degree.name Master of Science
Files
Original bundle
Now showing 1 - 1 of 1
Thumbnail Image
Name:
AU-Project-Report-Fulltext-164626.PDF
Size:
1.58 MB
Format:
Adobe Portable Document Format
Description:
Fulltext
Excerpt bundle
Now showing 1 - 1 of 1
Thumbnail Image
Name:
AU-Project-Report-Abstract-164626.PDF
Size:
76.02 KB
Format:
Adobe Portable Document Format
Description:
Abstract